
Field Data Generator (FDG) Operator
Trainer & Planning Systems
MSi’s FDG™ provides a comprehensive, very robust Operator
Trainer and Engineering Planning platform for conducting off-line
simulations of real-world process conditions for multiphase &
single-phase production, gathering, transmission and distribution
operations.
FDG™ is the only commercial package that offers a fully-integrated,
asset-wide training environment including single-phase, two-phase
and three-phase flow in wells, gathering lines, major trunk lines,
distribution systems and both off-shore and on-shore processing
equipment.
The FDG™ package can include modeling of pertinent topsides
and downstream processing facilities, including separators, scrubbers,
compressors, pumps, wing valves, chokes, columns, etc.
CMS (Caister-Murdoch)
FDG
|
FDG™ allows the Operator to understand the full gamut of
asset-wide interactivity, in a user-friendly environment. FDG™
gives the Operator to facility to quickly and effectively see the
cause-and-effect of different user-defined field scenarios on the
overall operations.
FDG™ accomplishes this in real-time speeds or several hundred,
even several thousand times real-time, depending on application,
while maintaining robust operations up-time.
Based on the same field-proven simulation engine as our real-time,
on-line packages, FDG™ is designed to achieve extremely fast
run-time speeds (500 to 200,000 x real-time).
Coupled with MSi’s real-time, on-line applications, FDG™
can even take the current, real-time state of the field operations
and use that as the starting point for the training session.
With FDG™, there is no more need to be ham-strung with interface,
speed and robustness issues when dealing with a separate simulator
engine for the wells and the pipelines and then a separate simulator
engine for the process equipment and so on.
Why settle for anything less.
From the wellhead to the
burner tip… FDG™ equates to speed,
robustness and accuracy, in a user-friendly package!
Fit-For-Purpose Applications
FDG™ offers one very robust, user-friendly Operator Training
platform to do a myriad of operational simulations and much more.
Case in point, with FDG™ the Operator can simulate the closing
and opening of individual well chokes simulating production rampup/rampdown.
They can immediately see the impact of that action on the slugging
behavior and fluids coming into the individual gathering lines and
into the manifolded lines. They can then visualize the cascade effect
of that event on all the processing equipments downstream, both
topsides as well as onshore receiving facilities. They can even
simulate a leak on the pipeline.
In this example scenario, FDG™ gives them quick and accurate
answers whether their action will cause slugging, bring off-spec
production into the processing plant, swamp/flood their processing
equipment, send a pressure surge downstream, etc. or everything
will be OK according to plan.
Example Applications of FDG™
- TESTING OPERATOR COMPETENCY AND RESPONSE
- SIMULATING PIGGING OPERATIONS
- REHEARSING PLANT STARTUP
- EMERGENCY PREPARATION FOR PROCESS UPSETS EVALUATING SYSTEM
CAPACITY
- SIMULATING TIME TO REACH STEADY-STATE OPERATING CONDITIONS
- EVALUATING COMPRESSOR AND PUMP STARTUPS
- DETERMINING “BAD GAS” OR OFF-SPEC PRODUCTION ARRIVAL
TIMES
- OPTIMIZING AND DEBOTTLENECKING CRITICAL PROCESSES AND OPERATIONS
- SIMULATING WELL RAMPUPS (FOR LIQUID SLUGGING) AND RAMPDOWN
(FOR LIQUID BUILDUP)
- EVALUATING RESPONSES FOR PLANNED AND UNPLANNED SHUT-DOWNS (E.G.
HYDRATE FORMATION POTENTIAL)
- EVALUATING LINE PACKING AND UNPACKING DYNAMICS
- PLANNING THE ADDITION OF NEW FIELDS
- UNDERSTANDING THE EFFECT OF GAS AND LIQUID COMPOSITION
- TUNING PROCESS CONTROL LOOPS
- EVALUATING PROCESS CONTROL CHANGES
- SIMULATING THE IMPACT OF PRODUCTION CHANGES INCLUDING CONDENSATE
AND WATER LOADINGS
- CONDUCTING LEAK SIMULATION AND EMERGENCY RESPONSE ANALYSIS
Example Model Components
FDG™ model can include, but not limited to the following
components:
- WELL PERFORMANCE INFORMATION
- WELLHEAD CHOKES
- SINGLE, TWO- & THREE-PHASE FLOWLINES
- RISER CONTROL VALVES
- MULTISTAGE SEPARATORS
- COMPRESSORS
- COMPRESSOR RECYCLE LOOPS
- PUMPS
- PROCESS CONTROL VALVES
- WET-GAS TRANSMISSION LINES
- ONSHORE SLUG CATCHERS
- PIGGING FACILITIES
Example Project Requirements
- VERY FAST & ROBUST SIMULATION OF MULTIPHASE PIPELINE OPERATIONS
- INTREGRATED MODEL FOR WELLS, FLOWLINES, TOPSIDES EQUIPMENT,
TRUNKLINE AND ONSHORE RECEIVING FACILITIES
- LIQUID HOLDUP PREDICTION
- RAMPUP SLUGGING PREDICTION
- COMPOSITION & WOBBE TRACKING
- BLENDING MANAGEMENT
- PIG TRACKING & PREDICTION
- LEAK DETECTION & LOCATION
- SAND & EROSIONAL CONTROL
- LINKAGES TO SCADA
|